Barcelona's sports installation is proposed to be transformed into a Musical Theatre, through a process that must be capable of being speedily returned to its original state and with a very low execution budget.
 
The installation of the stalls and the stage are the fundamental components in the new configuration..
 
The creation of a great fabric celling solves the new related needs of the operative proposals: special ambient, climatic, acoustic and light. 
 
This fabric celling appear as a big black box that houses new spectacles.
 
In 24hours, the space can return into its original appearence.
Back to Top